BAE Systems – New Reception
Sub Contractor: Allan Interiors
Worked closely with the Project Team to provide a modern Reception. The Client was keen to have something open for visitors to be able to see the workforce in the background.
Striped down existing walls, flooring, and ceiling then removed from site. Applied a screed to the existing sub floor. Installed new ceiling along with the glazed partitions. Decoration to high spec Interior Design. Floor installed towards end of the project.
Client: Very Satisfied
Site Works Completion: 4 – 6 Weeks